For fabricators

How to read an enquiry before you quote

18 November 2026

A site visit costs you half a day. Quoting blind costs you the job or the margin. The information in an enquiry, even a short one, is usually enough to decide which enquiries deserve the visit.

Quantity band is a buyer type, not just a number

One to five openings is almost always a homeowner replacing windows in a room or two. Sixteen to fifty is a floor, a villa, or a small project, and the person asking may be a contractor rather than the end user. Above fifty you are quoting to somebody who will compare your quote against two others on a spreadsheet, and who cares more about schedule reliability than about the cheapest rate.

These are different sales, not different sizes of the same sale. The homeowner wants to be reassured; the contractor wants to know you will not delay their handover.

Timeline tells you whether to go at all

Someone who needs it now has usually had a failure, a leak, a break-in or a handover date, and will decide quickly. Someone planning is gathering numbers and may buy in six months from whoever they still remember. Both are worth answering. Only one is worth dropping your afternoon for.

What the product choice reveals

A request for acoustic glazing means noise is the reason for the project, so the frame conversation is secondary and your quote should lead with the glass build. A request for sliding on a wide opening usually means space is tight behind the door. A request for tilt and turn means the buyer has done some reading, and will ask about hardware brand.

The questions that save the visit

Three of them, by message, before you travel:

  • Which floor, and is there anything outside that stops a sash swinging?
  • Are the existing frames coming out, or is this a new opening?
  • Has anyone else quoted, and roughly where did they land?

The third question is the one fabricators avoid asking and the one that most often decides whether the job is winnable. A buyer who has a number in mind that is far below what the specification costs is not a lost job, but it is a conversation to have before you measure, not after.

Answer everything, quickly

The single most common complaint buyers make about this trade is not price. It is that nobody called back. A short, prompt, honest reply to an enquiry you do not want is worth more than it costs, because the person asking will ask somebody about something again.

Found this useful? Tell Google you want UPVCLeads among the sources it shows you first.

Add as a preferred source on Google

Ready to get quotes?

Tell us what you need and we'll match you to verified fabricators covering your area.